PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed gravel at the 1st floor Electrical-Boiler Room Facing West.jpg Laying block at the 2nd floor Detention cells Facing South.jpg Laying out block at the 1st floor IT Room Facing South.jpg Erecting the stone panels at the East Elevation 1.jpg Erecting the stone panels at the East Elevation 2.jpg Erecting the stone panels at the East Elevation 3.jpg
Previous pageNext page Laying block at the 2nd floor Detention cells Facing South
Laying block at the 2nd floor Detention cells Facing South